Wimbledon Bridge House Phase 2

Look what we’ve done at the fridge on the bridge.

  • Erection of scaffolding and hoardings necessary for the works;
  • Removal of the glass canopy and concrete balcony from above the shop fronts;
  • Façade refurbishment/replacement to include cladding, glazing and shop fronts;
  • Concealment of existing concrete encased steel and concrete structures with new pilasters of both GRC and Anolok anodised panelling;
  • Re-configuration of means of access to, and escape from, affected shop units;
  • Re-configuration of service corridors and services within the affected areas; and,
  • New Purbeck Stone paving and glazed balustrading to frontage, including ramps.
  • 32 weeks

Location Wimbledon Bridge House, Wimbledon Project
Project Phase 2 works of a landmark office building located six miles from central London